{"id":51644,"date":"2025-10-10T10:10:03","date_gmt":"2025-10-10T15:10:03","guid":{"rendered":"https:\/\/students.austincc.edu\/infohub\/?p=51644"},"modified":"2025-10-10T10:10:06","modified_gmt":"2025-10-10T15:10:06","slug":"coming-soon-new-student-support-center-at-round-rock-campus","status":"publish","type":"post","link":"https:\/\/students.austincc.edu\/infohub\/2025\/10\/10\/coming-soon-new-student-support-center-at-round-rock-campus\/","title":{"rendered":"Coming Soon: New Student Support Center at Round Rock Campus"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"505\" src=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-AR-FA-and-VA-counters-1024x505.png\" alt=\"Room under construction with dry wall and exposed beams\" class=\"wp-image-51646\" srcset=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-AR-FA-and-VA-counters-1024x505.png 1024w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-AR-FA-and-VA-counters-300x148.png 300w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-AR-FA-and-VA-counters-768x379.png 768w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-AR-FA-and-VA-counters-1080x532.png 1080w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-AR-FA-and-VA-counters.png 1363w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"504\" src=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-Welcome-Center-1024x504.png\" alt=\"empty room under construction with concrete floor and open doors\" class=\"wp-image-51645\" srcset=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-Welcome-Center-1024x504.png 1024w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-Welcome-Center-300x148.png 300w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-Welcome-Center-768x378.png 768w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-Welcome-Center-1080x531.png 1080w, https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2025\/10\/RRC-1000-Welcome-Center.png 1384w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Big changes are coming to ACC\u2019s Round Rock Campus! The new Student Support Center is nearly complete and is set to open soon. The space is bringing together services like the Welcome Center, Career Center, Veterans Affairs, Advising, and Admissions in one easy-to-access location.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction is about 75% complete, with final touches like paint, flooring, and ceiling installation happening throughout October. The building is expected to reach substantial completion by late October or early November.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This project is funded through ACC\u2019s Maintenance and Operations Bond, which also supports other campus improvements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This isn\u2019t the only project underway at the Round Rock Campus. To learn more about the Applied Technology Expansion at the Round Rock Campus, visit <a href=\"http:\/\/austincc.edu\/bond\" target=\"_blank\" rel=\"noopener\">austincc.edu\/bond<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Big changes are coming to ACC\u2019s Round Rock Campus! The new Student Support Center is nearly complete and is set to open soon. The space is bringing together services like the Welcome Center, Career Center, Veterans Affairs, Advising, and Admissions in one easy-to-access location. Construction is about 75% complete, with final touches like paint, flooring, [&hellip;]<\/p>\n","protected":false},"author":103,"featured_media":51645,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[18],"tags":[69,156,1377,102,1280,1376,163],"class_list":["post-51644","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-for-you","tag-admissions","tag-advising","tag-career-center","tag-round-rock-campus","tag-student-support-center","tag-veterans-affairs","tag-welcome-center","et-has-post-format-content","et_post_format-et-post-format-standard"],"_links":{"self":[{"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/posts\/51644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/users\/103"}],"replies":[{"embeddable":true,"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/comments?post=51644"}],"version-history":[{"count":0,"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/posts\/51644\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/media\/51645"}],"wp:attachment":[{"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/media?parent=51644"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/categories?post=51644"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/students.austincc.edu\/infohub\/wp-json\/wp\/v2\/tags?post=51644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}